Xylem Fire Pump Package Pumping Systems S13421 REV.B Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Pumpen Xylem Fire Pump Package Pumping Systems S13421 REV.B herunter. Xylem Fire Pump Package Pumping Systems S13421 REV.B User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 10
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
INSTRUCTION MANUAL
S13421
REVISION B
Fire Pump Package
Pumping Systems
INSTALLER: PLEASE LEAVE THIS MANUAL FOR THE OWNER’S USE.
Seitenansicht 0
1 2 3 4 5 6 7 8 9 10

Inhaltsverzeichnis

Seite 1

INSTRUCTION MANUAL S13421 REVISION BFire Pump PackagePumping SystemsINSTALLER: PLEASE LEAVE THIS MANUAL FOR THE OWNER’S USE.

Seite 2 - TABLE OF CONTENTS

Xylem Inc. 10661 Newkirk Street Dallas, TX 75220 Phone: (469) 221-1200 Fax: (214) 357-5861www.xyleminc.com/brands/bellgossettBell & Gossett is a t

Seite 3 - SECTION 1 – GENERAL

PAGESECTION 1 – GENERALDESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . 1PURPOSE OF MANUAL . . . . . . . . . . . . . . . . . 1SAFETY INST

Seite 4

1SECTION 1 – GENERAL1.1 DESCRIPTIONFire Pump Package systems are custom built tothe requirements provided by the purchaser. TheAC Fire Pump Packag

Seite 5 - SECTION 2 – INSTALLATION

21.4.3 For periods of storage, the unit should be covered to prevent corrosion and contaminationfrom dirt. It should be stored in a clean, dry loca-t

Seite 6 - SECTION 3 – OPERATION

32.1 LOCATION2.1.1 Locate the pumping system in a clean, well venti-lated and properly drained location. It is recom-mended that the location selecte

Seite 7

43.1 PREPARATION3.1.1 After package is installed and foundation boltsare tightened, check pump alignment. Refer tospecific pump Installation, Operat

Seite 8

3.2.4 PUMP ROTATION, 3 PHASE MOTORS ONLY.Check rotation of electric driven fire pump andjockey pump; refer to appropriate pump, driverand controller

Seite 9 - ELECTRICAL

6APPENDIX AGENERAL– FINAL CHECK LIST___ 1. Is the unit base properly leveled, grouted andsecured?___ 2. Are all lubrication points properly lubr

Seite 10 - Xylem Inc

7APPENDIX BELECTRICALWIRING AND CONTROL SETTINGS – FINAL CHECK LIST___ 1. Does the feeder line voltage correspond to theunit voltage? Check the